Harrabin "Enabling out of the ordinary"

Cardinal Wiseman School

Refurbishment

The requirement was to provide newly refurbishment and re-modelled classrooms, science lab facilities and some external works following the lean-to extension construction.

There were adaptations to the electrical installation and extensive mechanical works including ventilation, heating, gas taps, hot, cold and waste to serve the new sinks and Vulcathene waste pipe installation with glass bottle traps for the chemical/science sinks.

There were fire-stopping works undertaken, this included pipe/cable penetrations, and large ventilation ductwork.

The project also included the erection of a single-story pitched roof extension and new UPVC windows, vinyl flooring and acoustic performing wall linings to all internal walls to prevent sound breakout into the adjoining classrooms.

The project required the isolation of power, water, air conditioning and gas to facilitate the new connections/installations within a live school environment, meaning, coordination, communication and programming were paramount to the successful completion of these areas.

The quality of the finish and smooth handover of the project was proven with us achieving a zero snag handover to the commendation of all.

Key Accountabilities

  • Work in an occupied building by both staff and students.
  • Ensure minimal disruption to the staff and students within the school during the construction phase.
  • Work in an existing building that required subdivision and safe & secure site compound segregation with delivery routes and school access being across our site at certain times

Gallery:

Description

Value:£350,000

Client:Coventry City Council

Harrabin Construction Limited, 1 Harnall Row, Coventry CV1 5DR