Harrabin "Enabling out of the ordinary"

The Institute for Advanced Manufacturing and Engineering (AME) Coventry University

Refurbishment

The Project was secured in competitive tender initially. Before the contract award given the complexity of the project and the coordination required for the specialist FF&E originally to be supplied by direct order from the client, we were asked to include the responsibility for the design, supply and installation of all the specialist equipment.

This extended to the installation of a CRAC unit which controlled temperature in one area to +/-half a degree, fume cupboards, chemical resistant worktops and the desks and seating for the teaching areas. Work involved working in multiple areas of adjacent buildings within the overall site and also involved the construction of a covered and enclosed link corridor between the buildings. There was a complete electrical installation throughout and extensive mechanical works including ventilation, heating, compressed air, cooling via air source heat pumps and hot cold and waste to new toilet facilities, furthermore; there was extensive Vulcathene waste pipe installation for the chemical/science sinks.

There were extensive fire-stopping works undertaken, this included pipe/cable penetrations, large ventilation ductwork, ceiling voids and fire breaks under partitions within raised computer access floors.

Key Accountabilities

  • Work in an occupied building by both staff and students.
  • Facilitate and manage the moving of specialist robotic and laser equipment within our programme.
  • Working with controlled temperature in one area to +/-half a degree, fume cupboards and chemicals
  • Work in an existing portal frame building that required subdivision.
  • Erection of high-specification Gyproc metal stud partitions to divide the space with enhanced acoustic performance to minimise noise bleed between the 2 areas.
  • The project required multiple phased handovers to facilitate the use of the office/teaching space ahead of the completion date. These areas included, but were not limited to, the isolation of power, water and air conditioning works to facilitate the new connections/installations within a live environment, meaning; coordination, communication and programming were paramount to the successful completion of these areas
  • Ensure minimal disruption to the staff and students using the facility.

Gallery:

Description

Value:£3,100,000

Client:Coventry University