University of Warwick Toilet Refurbishment
Refurbishment
The requirement was to refurbish all the toilets throughout the Computer Science Building during the summer of 2024, and the Ground Floor Gibbet Hill Female and disabled toilets.
The contract extended across four floors, in varying locations and three differing buildings, with works proceeding in each location and a requirement to deliver the completed project during the summer period.
The university split the work into two elements, with the Computer Science Refurb commencing first, with the variation of the Gibbet Hill toilets following into October & November.
Role & Delivery
Following a competitive tender, Harrabin Construction were engaged as the principal Contractor to deliver the project. The project was completed in two phases, completing September 2024 and November 2024. The works were successfully handed over on time and to a very good standard
Gallery:
Description
Value:Circa £420,000
Client:University of Warwick