Warwick Business School
Refurbishment
Following competitive tender Harrabin Construction was engaged as Principal Contractor to deliver the project. The contract extended across four differing locations and two differing buildings with works proceeding in each location and a requirement to deliver the completed project within 10 weeks.
The university split the work into two elements with the three rooms being the first phase and the fourth research lab, including the VR area, being the final phase. Significant design responsibility for joinery and mechanical and electrical services was required and successfully delivered.
The main alterations were carried out in the Warwick Business School building with adaptions to create a Research Lab within the Gilmore Centre on the ground floor, and alterations within the 1st and 2nd floors to divide and create new meeting room/office spaces within a large open area.
The adaptations included the formation of new low-level panelling for existing ventilation with powder-coated grilles. New stud partitions were installed to divide the spaces and provide new lockable cupboards and locker facilities.
In addition, the existing toilets were stripped out and fitted out with new IPS panels and sanitaryware, items that required early engagement to ensure the long lead-in period didn’t hinder the handover of the project.
Work was required to be completed within 10 weeks for Phase 1 and 7 weeks for Phase 2
Key Accountabilities
- Working in a building occupied by students and staff within an educational environment.
- Due to the building being occupied, careful planning was required for the removal and delivery of materials and therefore a designated agreed route was implemented, and material transportation was undertaken during ‘quiet times’.
- Due to the building occupation careful disposal of materials to prevent dust and noise pollution and maintaining a tidy site was paramount.
Gallery:
Description
Value:£430,000
Client:University of Warwick
Architect:IDP