Harrabin "Enabling out of the ordinary"

Delia Derbyshire café, Coventry University

Fit Out

The electrical specification was designed by Coventry University and the installation consisted of new electrical supplies to the kitchen and relocation of the existing lighting within the newly installed black suspended ceiling. In addition to this, a new data port for the till system and installation of a new fire alarm device along with the recommissioning of the existing fire alarm devices.

A new extraction system was connected to the existing University ducting and ventilation system. The extraction grilles within the server area were colour-coded to blend in with the black ceiling tiles for an aesthetically pleasing finish.

Coventry University novated a specialist kitchen design company. As the main contractor, we engaged early with our supply chain, and the Client at an early stage to iron out any design issues and capture all the employer’s requirements.

With our proactiveness and approach to the project, the 8-week programme was fast-tracked and completed early for the client

Gallery:

Description

Value:£123,000

Client:Coventry University

Harrabin Construction Limited, 1 Harnall Row, Coventry CV1 5DR
Our new office is the medieval timber frame building as shown in the photograph.
Our new offices