Harrabin "Enabling out of the ordinary"

Coventry University Frederick Lanchester Library

Refurbishment

Re-modelling of the entrance lobby with purpose built reception and check out desks, upgraded access controls and gates

View case study >

Garth House and Hornton Grange

Refurbishment

This is a new project that we've undertaken at Birmingham University. Garth House is a refurbishment of the existing building, Grade 2 listed building.

View case study >

King Henry VIII School New Swimming Pool, Gymnasium and Associated Changing Rooms

New build

The construction of the striking new school swimming pool facility, to compliment the conservation area, was successfully completed in the heart of an existing school environment and provide a CHP unit that feeds back into the school and electric grid.

View case study >

Priors Marston Free School

Reconstruction

Priors Free school is a locally listed 19th century stone built primary school which had a 1960’s extension that was no longer consider fit for purpose.

View case study >

Warwick University – Institute of Education and Avon Building and Graduate Studies Refurbishment

Refurbishment

A challenging project which involved the refurbishment of the existing facilities in an occupied building to give both a major internal facelift and provide improved disabled facilities to the Institute of Education.

View case study >

Warwick School Sports Pavilion

New Build

Opened by Lord Coe in March 2013 this new multi purpose sports pavilion was constructed over two floors and linked to newly constructed classrooms and medical center by a large glazed atrium stairwell connected to the existing changing rooms and swimming pool

View case study >

Accreditations

Harrabin Construction Limited, 1 Harnall Row, Coventry CV1 5DR
Our new office is the medieval timber frame building as shown in the photograph.
Our new offices